Alt CNC

Call us

07968 818 958
7-Day Relocation for Haas & Nakamura Machines
Client Spotlight

7-Day Move for Haas
& Nakamura Machines

AUTHOR: ALT CNC Editorial
READ TIME: 6 Min Read

Fast-Track Factory Relocation for Nakamura & Haas Machining Cells

When moving high-value CNC machinery, speed and safety must go hand-in-hand. In precision subcontract manufacturing, prolonged downtime directly impacts delivery commitments, revenue, and customer trust.

Our team at Alt CNC recently delivered an end-to-end relocation project involving a cell of high-performance Nakamura-Tome WT-150II multi-tasking turning centres and Haas vertical machining centres.

The Scope: 7 Days Decommission to Live Production

Moving a mixed-machine cell of heavy multi-axis turning centres and vertical mills requires careful planning, specialised transport, and rigorous geometric recommissioning.

Our engineering team executed a complete 5-step turnkey package:

  1. Decommissioning - Powering down, draining coolant, detaching LNS bar feeders, chip conveyors, and external ancillaries across both the Nakamura-Tome and Haas assets.

  2. Heavy Lifting & Loading - Utilising specialised rigging equipment, skate sets, and Versa-Lift heavy-duty forklifts to safely extract the machinery and load them onto curtain-side transport.

  3. Transport & Transit - Securely chaining, skidding, and transporting the multi-tonne machinery across sites.

  4. Offloading & Positioning - Navigating tight access gangways at the destination facility to skid and manoeuvre each unit into its new cell layout.

  5. Recommissioning & Precision Alignment - Re-connecting power, levelling, re-anchoring, and performing geometric DTI checks to guarantee OEM-level precision.

Delivering Results Under Pressure

Completing a complex multi-machine move in 7 days demands total technical control. Every stage was synchronised to ensure that as soon as a machine hit the shop floor at the new facility, our engineers were immediately on-hand to level, power up, and run test cuts.

By day 7, the cell was fully operational. In fact, our customer was already back to producing live production parts on-site in front of their visiting end-customer, who was thoroughly impressed by the rapid, seamless transition.

Need a Fast Turnaround Machine Tool Relocation?

Whether you need to move a single workhorse CNC machine or relocate an entire facility under tight deadlines, Alt CNC provides fully insured, turnkey relocation services across the UK with minimal disruption to your business. Get in touch today!

Gallery

7-Day Move for Haas & Nakamura Machines

Nakamura & Haas Machines 1
Nakamura & Haas Machines 2
Nakamura & Haas Machines 3
Nakamura & Haas Machines 4
Nakamura & Haas Machines 5
Nakamura & Haas Machines 6
Nakamura & Haas Machines 7
Nakamura & Haas Machines 8